Bearing RI-814ZZ NMB

100% Authentic. Kate Komatsu part Machinery Co., Ltd Bearing RI-814ZZ NMB Highest 0.0 Inventory Quality. Flange Block Category Certified Supplier.

Category:Flange Block
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:0.28
Product Group:M06110
Number of Mounting Holes:2
Mounting Method:Set Screw
Housing Style:2 Bolt Flange Block

Product Details

CategoryFlange Block
Inventory0.0
Minimum Buy QuantityN/A
Weight0.28
Product GroupM06110
Number of Mounting Holes2
Mounting MethodSet Screw
Housing Style2 Bolt Flange Block
Rolling ElementBall Bearing
Housing MaterialCast Iron
Expansion / Non-expansionNon-expansion
Mounting Bolts5/16 Inch
RelubricatableYes
Insert Part NumberB4-12
SealsContact Seal
Housing Configuration1 Piece Solid
Pilot ConfigurationNo Pilot
Inch - MetricInch
Long Description2 Bolt Flange Block; 3/4" Bore; 2.8" Bolt Circle; 2-13/16" Bolt Spacing; 1 Piece Solid; Set Screw Mount; Cast Iron; Ball Bearing; 0.972" Length Thru Bore; Relubricatable; Contact S
Other FeaturesSingle Row | Spherical | Normal Duty
UNSPSC31171501
Harmonized Tariff Code8483.20.40.40
NounBearing
Keyword StringFlanged
Manufacturer Item NumberBFX204-12
Weight / LBS0.62
Nominal Bolt Circle Diameter Round2.8 Inch | 71 Millimeter
D0.972 Inch | 24.7 Millimeter
Bolt Spacing2.813 Inch | 71.45 Millimeter
Cartridge Pilot Diameter0 Inch | 0 Millimeter
Cartridge Pilot Depth0 Inch | 0 Millimeter
d0.75 Inch | 19.05 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now