CONTITECH M-3 5/8 Bushings

Various RETAINING & LOCKING DEVICES Mounted Hanger Units Category types and sizes to accommodate your Kate Komatsu part Machinery Co., Ltd 0.0 Inventory CONTITECH M-3 5/8 Bushings requirements.

Category:Mounted Hanger Units
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:0.418
Product Group:M06110
Mounting Method:Set Screw
Housing Material:Thermoplastic
Mounting Thread:1/2 Straight Pipe Female

Product Details

CategoryMounted Hanger Units
Inventory0.0
Minimum Buy QuantityN/A
Weight0.418
Product GroupM06110
Mounting MethodSet Screw
Housing MaterialThermoplastic
Mounting Thread1/2 Straight Pipe Female
Rolling ElementBall Bearing
Insert MaterialZinc Coated Steel
Expansion / Non-expansionNon-expansion
Housing StyleHanger Unit
RelubricatableYes
Insert Part NumberUC205-14MZ2RF
SealsDouble Lip Contact
RatingNormal Duty
Other FeaturesSingle Row | Spherical | Wide Inner Race | Black Housing | 2 Open Cover
Long Description7/8" Bore; 2-1/2" Base to Center Height; Set Screw; Hanger Unit; Thermoplastic Housing; Ball Bearing; 2-29/32" Housing Outside Diameter; 1.339" Length Thru Bore; 3-57/64" Hous
Inch - MetricInch
UNSPSC31171513
Harmonized Tariff Code8483.20.40.40
NounBearing
Keyword StringHanger
Manufacturer Item NumberUCHPL20514MZ2RFCB
Weight / LBS0.92
D2.906 Inch | 73.812 Millimeter
d0.875 Inch | 22.225 Millimeter
B2.5 Inch | 63.5 Millimeter
Housing Overall Length3.891 Inch | 98.831 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now