CONTITECH N-4 15/16 Bushings

RETAINING & LOCKING DEVICES offers a CONTITECH N-4 15/16 Bushings selection of Genuine RETAINING & LOCKING DEVICES at Wholesale Prices. We are a Kate Komatsu part Machinery Co., Ltd CONTITECH N-4 15/16 Bushings 1300 Series Certified Parts Retailer

Series:1300
Cone Part Number:1380H
Cup Part Number:1328X
Design Units:Imperial
Bearing Weight:0.20 Kg
Cage Type:Stamped Steel
d:22.225 mm
D:52.388 mm

Product Details

Series1300
Cone Part Number1380H
Cup Part Number1328X
Design UnitsImperial
Bearing Weight0.20 Kg
Cage TypeStamped Steel
d22.225 mm
D52.388 mm
B - Cone Width20.168 mm
C - Cup Width14.288 mm
B19.368 mm
R - Cone Backface To Clear Radius11.520 mm
r - Cup Backface To Clear Radius21.52 mm
da - Cone Frontface Backing Diameter28.96 mm
db - Cone Backface Backing Diameter31.5 mm
Da - Cup Frontface Backing Diameter49.00 mm
Db - Cup Backface Backing Diameter44.96 mm
Ab - Cage-Cone Frontface Clearance1.8 mm
Aa - Cage-Cone Backface Clearance0.8 mm
a - Effective Center Location3-7.6 mm
C90 - Dynamic Radial Rating (90 million revolutions)43310 lbf
C1 - Dynamic Radial Rating (1 million revolutions)512800 lbf
C0 - Static Radial Rating10900 lbf
Ca90 - Dynamic Thrust Rating (90 million revolutions)61650 lbf
K - Factor72
e - ISO Factor80.29
Y - ISO Factor92.05
G1 - Heat Generation Factor (Roller-Raceway)10.3
G2 - Heat Generation Factor (Rib-Roller End)5.2
Cg - Geometry Factor0.0508
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now