CONTITECH PS-5 7/16 Bushings

How Kate Komatsu part Machinery Co., Ltd N/A Minimum Buy Quantity do you Cylindrical Roller Bearing Category find the CONTITECH PS-5 7/16 Bushings specification? 0.0 Inventory Manufacturers Online Free check!

Category:Cylindrical Roller Bearing
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:3.13
Product Group:B04144
Bore Profile:Straight
Cage Material:Steel
Precision Class:RBEC 1 | ISO P0

Product Details

CategoryCylindrical Roller Bearing
Inventory0.0
Minimum Buy QuantityN/A
Weight3.13
Product GroupB04144
Bore ProfileStraight
Cage MaterialSteel
Precision ClassRBEC 1 | ISO P0
Number of Rows of RollersSingle Row
SeparableInner Ring - Both Sides
Rolling ElementCylindrical Roller Bearing
ProfileComplete with Outer and Inner Ring
Snap RingNo
Internal ClearanceC0-Medium
RetainerYes
RelubricatableYes
Inch - MetricMetric
Other FeaturesStandard Capacity | Plain Inner Ring | 2 Rib Outer Ring | Narrow Width | Medium Series | Cage on Outer Ring ID
Long Description70MM Bore; Straight Bore Profile; 150MM Outside Diameter; 35MM Width; Steel Cage Matetrial; RBEC 1 | ISO P0; Single Row; Inner Ring - Both Sides Separable; No Snap Ring; Relubricatable; C0-Medium Inte
UNSPSC31171547
Harmonized Tariff Code8482.50.00.00
NounBearing
Manufacturer Item NumberMA1314EX
Manufacturer Internal Number7505259
Weight / LBS6.886
D5.906 Inch | 150 Millimeter
B1.378 Inch | 35 Millimeter
d2.756 Inch | 70 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now