NTN H2330 Retaining & Locking Devices

QuestionNTN H2330 Retaining & Locking Devices ? Needle Non Thrust Roller Bearing Category Find Kate Komatsu part Machinery Co., Ltd what N/A Minimum Buy Quantity you need faster by entering your RETAINING & LOCKING DEVICES information .

Category:Needle Non Thrust Roller Bearing
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:0.076
Product Group:B04144
Rolling Element:Needle Roller Bearing
Component:Roller Assembly with Outer Ring - No Inner Ring
Enclosure:2 Seals

Product Details

CategoryNeedle Non Thrust Roller Bearing
Inventory0.0
Minimum Buy QuantityN/A
Weight0.076
Product GroupB04144
Rolling ElementNeedle Roller Bearing
ComponentRoller Assembly with Outer Ring - No Inner Ring
Enclosure2 Seals
Self AligningNo
RetainerYes
Number of Rows of RollersSingle Row
SeparableNo
Closed EndNo
Inch - MetricInch
RelubricatableYes
Thrust BearingNo
Long Description7/8" Bore; 1-3/8" Outside Diameter; 1" Width; Needle Roller Bearing; Roller Assembly with Outer Ring - No Inner Ring; 2 Seals Enclosure; No Self Aligning; Yes Retainer; Single Row of Ro
Other Features2 Rib Outer Ring | Steel Cage | Heavy Duty | Oil Hole
UNSPSC31171512
Harmonized Tariff Code8482.40.00.00
NounBearing
Keyword StringNeedle
Manufacturer Item NumberMR-14-RSS
Manufacturer Internal Number5451450000
Weight / LBS0.168
B1 Inch | 25.4 Millimeter
d0.875 Inch | 22.225 Millimeter
D1.375 Inch | 34.925 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now