KOMATSU 424-S62-4122 BRACKET

Online shopping 0.0 Inventory KOMATSU 424-S62-4122 BRACKET from a great Mounted Hanger Units Category selection at Store. ... BRACKET Accessories. Kate Komatsu part Machinery Co., Ltd

Category:Mounted Hanger Units
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:0.59
Product Group:M06110
Mounting Method:Set Screw
Housing Material:Thermoplastic
Mounting Thread:5/8 Straight Pipe Female
PDF

Product Details

CategoryMounted Hanger Units
Inventory0.0
Minimum Buy QuantityN/A
Weight0.59
Product GroupM06110
Mounting MethodSet Screw
Housing MaterialThermoplastic
Mounting Thread5/8 Straight Pipe Female
Rolling ElementBall Bearing
Insert MaterialNickel Coated Steel
Expansion / Non-expansionNon-expansion
Housing StyleHanger Unit
RelubricatableYes
Insert Part NumberUC206-20MZ20RF
SealsDouble Lip Contact
RatingNormal Duty
Other FeaturesSingle Row | Spherical | Wide Inner Race | White Housing | Buna Nitrile Seal
Long Description1-1/4" Bore; 3" Base to Center Height; Set Screw; Hanger Unit; Thermoplastic Housing; Ball Bearing; 3-1/2" Housing Outside Diameter; 1-1/2" Length Thru Bore; 4-59/64" Housing
Inch - MetricInch
UNSPSC31171513
Harmonized Tariff Code8483.20.40.40
NounBearing
Keyword StringHanger
Manufacturer Item NumberUCHPL20620MZ20RFW
Weight / LBS1.3
d1.25 Inch | 31.75 Millimeter
B3 Inch | 76.2 Millimeter
D3.5 Inch | 88.9 Millimeter
Housing Overall Length4.922 Inch | 125.019 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now