KOMATSU 566-61-82150 BRACKET

Online Take Up Units Category shopping KOMATSU 566-61-82150 BRACKET from a 0.0 Inventory great selection Kate Komatsu part Machinery Co., Ltd at Store. ... BRACKET N/A Minimum Buy Quantity Accessories.

Category:Take Up Units
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:95.34
Product Group:M06288
Component Description:Take Up Unit with Frame
Rolling Element:Spherical Roller Bearing
Housing Style:Center Pull Vertical Elevator Head End
PDF

Product Details

CategoryTake Up Units
Inventory0.0
Minimum Buy QuantityN/A
Weight95.34
Product GroupM06288
Component DescriptionTake Up Unit with Frame
Rolling ElementSpherical Roller Bearing
Housing StyleCenter Pull Vertical Elevator Head End
Mounting MethodConcentric Collar
Compatible Take Up FrameZGT11
Adjustment Travel Length10
Insert Part Number5400U
Housing MaterialCast Iron
Other FeaturesDouble Row | Heavy Duty | Double Collar | Welded Steel Frame | Clearance Seal | With Set Screw
Inch - MetricInch
Long DescriptionTake Up Unit with Frame; 4" Bore; Spherical Roller Bearing; Center Pull Vertical Elevator Head End; Concentric Collar Mount; ZGT11 Take Up Frame; 10 Adjustment Travel; 5400U Insert Part; Cast Iro
UNSPSC31171533
Harmonized Tariff Code8483.20.40.80
NounBearing
Keyword StringTake Up
Manufacturer Internal Number6871552
Weight / LBS210
Slot to Slot Distance0 Inch | 0 Millimeter
d4 Inch | 101.6 Millimeter
Slot Width0 Inch | 0 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now