KOMATSU SHOE ASS'Y 208-32-03032

Our highly-skilled and factory-trained service experts have the resources to Single Row Ball Bearing Category help you N/A Minimum Buy Quantity with all your KOMATSU SHOE ASS'Y 208-32-03032 needs - including routine maintenance, Kate Komatsu part Machinery Co., Ltd major repairs, warranty service, and SHOE ASS'Y equipment inspections.

Category:Single Row Ball Bearing
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:0.03
Product Group:B00308
Enclosure:2 Seals
Precision Class:ABEC 1 | ISO P0
Maximum Capacity / Filling Slot:No
PDF

Product Details

CategorySingle Row Ball Bearing
Inventory0.0
Minimum Buy QuantityN/A
Weight0.03
Product GroupB00308
Enclosure2 Seals
Precision ClassABEC 1 | ISO P0
Maximum Capacity / Filling SlotNo
Rolling ElementBall Bearing
Snap RingNo
Internal Special FeaturesNo
Cage MaterialSteel
Enclosure TypeNon-Contact Seal
Internal ClearanceSpecial
Inch - MetricMetric
Long Description17MM Bore; 35MM Outside Diameter; 10MM Outer Race Width; 2 Seals; Ball Bearing; ABEC 1 | ISO P0; No Filling Slot; No Snap Ring; No Internal Special Features; Special Internal Clearance; Steel Cage; No
Other FeaturesDeep Groove | Rubber Seal
UNSPSC31171504
Harmonized Tariff Code8482.10.50.68
NounBearing
Keyword StringBall
Weight / LBS0.0904
d0.669 Inch | 17 Millimeter
D1.378 Inch | 35 Millimeter
Outer Race Width0.394 Inch | 10 Millimeter
Inner Race Width0 Inch | 0 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now