KOMATSU FRAME ASS'Y 14X-72-71900

Enjoy High Precision Ball Bearings Category Margins on Kate Komatsu part Machinery Co., Ltd Competitive FRAME ASS'Y Pricing.Great N/A Minimum Buy Quantity Wholesale Products at Low Costs.

Category:Precision Ball Bearings
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:2.75
Product Group:B04270
Enclosure:Open
Precision Class:ABEC 7 | ISO P4
Material - Ball:Steel
PDF

Product Details

CategoryPrecision Ball Bearings
Inventory0.0
Minimum Buy QuantityN/A
Weight2.75
Product GroupB04270
EnclosureOpen
Precision ClassABEC 7 | ISO P4
Material - BallSteel
Number of Bearings4 (1 Quadruplex Set)
Contact Angle25 Degree
PreloadLight
Raceway Style1 Rib Outer Ring
Cage MaterialPhenolic
Rolling ElementBall Bearing
Mounting ArrangementQuadruplex-Tandem and Back to Back
Flush GroundYes
Inch - MetricMetric
Other FeaturesSingle Row | Angular Contact | High Precision
Long Description75MM Bore; 115MM Outside Diameter; 80MM Width; Open Enclosure; ABEC 7 | ISO P4 Precision; Steel Ball Material; 4 (1 Quadruplex Set) Bearings; 25 Degree Contact Angle; Phenolic Cage Material; 1 Rib Out
UNSPSC31171531
Harmonized Tariff Code8482.10.50.28
NounBearing
Keyword StringAngular Contact Ball
Manufacturer Item Number7015 ACD/P4AQBCA
Weight / LBS6.063
d2.953 Inch | 75 Millimeter
B3.15 Inch | 80 Millimeter
D4.528 Inch | 115 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now