Hood assembly of PC60-7, excavator parts, part NO. is 201-54-75105

High Quality Hood assembly of PC60-7, excavator parts, part NO. is 201-54-75105. Competitive PC60-7 Pricing. N/A Minimum Buy Quantity Accept Small Order. Pillow Block Category Easy and Kate Komatsu part Machinery Co., Ltd Fast Shipping.

Category:Pillow Block
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:56.296
Product Group:M06288
Number of Mounting Holes:4
Mounting Method:V Lock
Housing Style:4 Bolt Pillow Block
PDF

Product Details

CategoryPillow Block
Inventory0.0
Minimum Buy QuantityN/A
Weight56.296
Product GroupM06288
Number of Mounting Holes4
Mounting MethodV Lock
Housing Style4 Bolt Pillow Block
Rolling ElementSpherical Roller Bearing
Housing MaterialCast Steel
Expansion / Non-expansionNon-expansion
Mounting Bolts1-1/8 Inch
RelubricatableYes
Insert Part Number22228
SealsDouble Lip Viton
Housing Configuration1 Piece Solid
Inch - MetricInch
Other FeaturesDouble Row | Double Nut
Long Description4 Bolt Pillow Block; 4-15/16" Bore; 6-1/8" Base to Center Height; V Lock Mount; Spherical Roller Bearing; 15-1/4" Minimum Bolt Spacing; 16-3/4" Bolt Spacing Maximum; Relubricatable
UNSPSC31171511
Harmonized Tariff Code8483.20.40.80
NounBearing
Keyword StringPillow Block
Manufacturer Item NumberQVVPX28V415SC
Weight / LBS136
Actual Bolt Center to Center0 Inch | 0Millimeter
D7.02 Inch | 178.3 Millimeter
d4.938 Inch | 125.425 Millimeter
Bolt Spacing Maximum16.75 Inch | 425.45Millimeter
B6.125 Inch | 155.575 Millimeter
Nominal Bolt Center to Center16 Inch | 406.4 Millimeter
Bolt Spacing Minimum15.25 Inch | 387.35Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now