Front Idler Pc200-5 Idler Roller Welding Machine

Front Idler Pc200-5 Idler Roller Welding Machine Engineering Take Up Units Category Calculator 0.0 Inventory , PC200 N/A Minimum Buy Quantity Manufacturing Kate Komatsu part Machinery Co., Ltd Service . Get Your Free.

Category:Take Up Units
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:1.678
Product Group:M06110
Component Description:Take Up Bearing Only
Rolling Element:Ball Bearing
Housing Style:Unit Only
PDF

Product Details

CategoryTake Up Units
Inventory0.0
Minimum Buy QuantityN/A
Weight1.678
Product GroupM06110
Component DescriptionTake Up Bearing Only
Rolling ElementBall Bearing
Housing StyleUnit Only
Mounting MethodSet Screw
Compatible Take Up FrameNot Specified
Insert Part NumberUG220NL
Housing MaterialCast Iron
Other FeaturesSingle Row | Spherical | Standard Duty | Wide Inner Race | Wide Slot | One Lip Seal
Inch - MetricInch
Long DescriptionTake Up Bearing Only; 1-1/4" Bore; 17/32" Slot Width; 3-1/2" Slot to Slot Distance; Ball Bearing; Unit Only; Set Screw Mount; UG220NL Insert Part; Cast Iron Housing Material
UNSPSC31171533
Harmonized Tariff Code8483.20.40.40
NounBearing
Keyword StringTake Up
Manufacturer Item NumberTH3U220N
Manufacturer Internal Number5814751
Weight / LBS3.7
Slot to Slot Distance3.5 Inch | 88.9 Millimeter
Slot Width0.531 Inch | 13.5 Millimeter
d1.25 Inch | 31.75 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now