High quality Pilot Valve Assy for PC200-6 PC200-7 Excavator

170 Million used 0.0 Inventory High quality Pilot Valve Assy for PC200-6 PC200-7 Excavator N/A Minimum Buy Quantity instantly Flange Block Category searchable. Shop Kate Komatsu part Machinery Co., Ltd our large selection of parts based on brand, price, description, and location. Order the PC200 with stock ...

Category:Flange Block
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:6.356
Product Group:M06288
Number of Mounting Holes:4
Mounting Method:V Lock
Housing Style:4 Bolt Round Flange Block
PDF

Product Details

CategoryFlange Block
Inventory0.0
Minimum Buy QuantityN/A
Weight6.356
Product GroupM06288
Number of Mounting Holes4
Mounting MethodV Lock
Housing Style4 Bolt Round Flange Block
Rolling ElementSpherical Roller Bearing
Housing MaterialCast Steel
Expansion / Non-expansionExpansion
Mounting Bolts12 Millimeter
RelubricatableYes
Insert Part Number22211
SealsTriple Lip Nitrile Rubber
Housing Configuration1 Piece Solid
Pilot ConfigurationWith Pilot
Inch - MetricMetric
Long Description4 Bolt Round Flange Block; 50MM Bore; 148MM Bolt Circle; 103.4MM Bolt Spacing; 1 Piece Solid; V Lock Mount; Cast Steel; Spherical Roller Bearing; 79.8MM Length Thru Bore; Relubricatable; Triple Lip Ni
Other FeaturesDouble Row | Single Nut
UNSPSC31171501
Harmonized Tariff Code8483.20.40.80
NounBearing
Keyword StringFlanged
Manufacturer Item NumberQVFYP11V050SEM
Weight / LBS12
Nominal Bolt Circle Diameter Round5.8 Inch | 148 Millimeter
Cartridge Pilot Diameter4.375 Inch | 111.13 Millimeter
D3.142 Inch | 79.8 Millimeter
Cartridge Pilot Depth0.188 Inch | 4.775 Millimeter
d1.969 Inch | 50 Millimeter
Bolt Spacing4.071 Inch | 103.4 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now