Excavator Pump PC210-8 hydraulic pump,PC220-8 PC240-8 PC270-8 main pump 708-2L-00400 708-2L-00490 708-2L-00500 708-2L-00600

How do I place an EMERGENCY order for N/A Minimum Buy Quantity a Excavator Pump PC210-8 hydraulic pump,PC220-8 PC240-8 PC270-8 main pump 708-2L-00400 708-2L-00490 708-2L-00500 708-2L-00600 Precision Ball Bearings Category that I want to pick up at a our Kate Komatsu part Machinery Co., Ltd store?

Category:Precision Ball Bearings
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:0.06
Product Group:B00152
Enclosure:Open
Precision Class:ABEC 3 | ISO P6
Material - Ball:Steel

Product Details

CategoryPrecision Ball Bearings
Inventory0.0
Minimum Buy QuantityN/A
Weight0.06
Product GroupB00152
EnclosureOpen
Precision ClassABEC 3 | ISO P6
Material - BallSteel
Number of Bearings1 (Single)
Contact Angle25 Degree
PreloadNone
Raceway StyleNot Applicable
Cage MaterialPolyamide
Rolling ElementBall Bearing
Flush GroundNo
Inch - MetricMetric
Other FeaturesDouble Row | Angular Contact
Long Description12MM Bore; 32MM Outside Diameter; 15.9MM Width; Open Enclosure; ABEC 3 | ISO P6 Precision; Steel Ball Material; 1 (Single) Bearing; 25 Degree Contact Angle; Polyamide Cage Material; Ball Bearing
UNSPSC31171531
Harmonized Tariff Code8482.10.50.28
NounBearing
Keyword StringBall Angular Contact
B0.626 Inch | 15.9 Millimeter
d0.472 Inch | 12 Millimeter
D1.26 Inch | 32 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now