excavator PC400-7,PC450-7,PC160-7,PC200-7,PC220-7,PC270-7,PC300-7,PC350-7,pc200-8 CAB monitor,7835-10-2004,7835-10-2005

What is excavator PC400-7,PC450-7,PC160-7,PC200-7,PC220-7,PC270-7,PC300-7,PC350-7,pc200-8 CAB monitor,7835-10-2004,7835-10-2005 in mechanical engineering? komatsu PC450-8 parts Pillow Block Category Manufacturing Service Kate Komatsu part Machinery Co., Ltd . Upload your CAD file for an instant.

Category:Pillow Block
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:8.626
Product Group:M06288
Number of Mounting Holes:2
Mounting Method:V Lock
Housing Style:2 Bolt Pillow Block
PDF

Product Details

CategoryPillow Block
Inventory0.0
Minimum Buy QuantityN/A
Weight8.626
Product GroupM06288
Number of Mounting Holes2
Mounting MethodV Lock
Housing Style2 Bolt Pillow Block
Rolling ElementSpherical Roller Bearing
Housing MaterialCast Steel
Expansion / Non-expansionNon-expansion
Mounting Bolts3/4 Inch
RelubricatableYes
Insert Part Number22213
SealsTriple Lip Urethane
Housing Configuration1 Piece Solid
Inch - MetricMetric
Other FeaturesDouble Row | Double Nut
Long Description2 Bolt Pillow Block; 55MM Bore; 76.2MM Base to Center Height; V Lock Mount; Spherical Roller Bearing; 194.564MM Minimum Bolt Spacing; 223.012MM Bolt Spacing Maximum; Relubricatable; Cast Steel; Triple
UNSPSC31171511
Harmonized Tariff Code8483.20.40.80
NounBearing
Keyword StringPillow Block
Weight / LBS22
d2.165 Inch | 55 Millimeter
Bolt Spacing Minimum7.66 Inch | 194.564Millimeter
Actual Bolt Center to Center0 Inch | 0Millimeter
B3 Inch | 76.2 Millimeter
Nominal Bolt Center to Center8.2 Inch | 208.3 Millimeter
D4.02 Inch | 102.108 Millimeter
Bolt Spacing Maximum8.78 Inch | 223.012Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now