208-70-61610 Hydraulic Boom Bushing for PC400LC-8 PC450-8R PC400-6 EXCAVATOR

100% Kate Komatsu part Machinery Co., Ltd N/A Minimum Buy Quantity Authentic. 208-70-61610 Hydraulic Boom Bushing for PC400LC-8 PC450-8R PC400-6 EXCAVATOR Pillow Block Category Highest Quality. Certified Supplier.

Category:Pillow Block
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:10.442
Product Group:M06288
Number of Mounting Holes:2
Mounting Method:Concentric Collar
Housing Style:2 Bolt Pillow Block
PDF

Product Details

CategoryPillow Block
Inventory0.0
Minimum Buy QuantityN/A
Weight10.442
Product GroupM06288
Number of Mounting Holes2
Mounting MethodConcentric Collar
Housing Style2 Bolt Pillow Block
Rolling ElementSpherical Roller Bearing
Housing MaterialCast Steel
Expansion / Non-expansionNon-expansion
Mounting Bolts3/4 Inch
RelubricatableYes
Insert Part Number22215
SealsTriple Lip Urethane
Housing Configuration1 Piece Solid
Inch - MetricInch
Other FeaturesDouble Row | Single Collar | With Set Screw
Long Description2 Bolt Pillow Block; 2-15/16" Bore; 3-1/4" Base to Center Height; Concentric Collar Mount; Spherical Roller Bearing; 7.7" Minimum Bolt Spacing; 8.4" Bolt Spacing Maximum; Relubrica
UNSPSC31171511
Harmonized Tariff Code8483.20.40.80
NounBearing
Keyword StringPillow Block
Manufacturer Item NumberQAPL15A215SO
Weight / LBS28
d2.938 Inch | 74.625 Millimeter
Nominal Bolt Center to Center8.1 Inch | 206.4 Millimeter
Actual Bolt Center to Center0 Inch | 0Millimeter
D3.62 Inch | 91.948 Millimeter
B3.25 Inch | 82.55 Millimeter
Bolt Spacing Minimum7.7 Inch | 195.58Millimeter
Bolt Spacing Maximum8.4 Inch | 213.36Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now