6742-01-5159 6742-01-1520 LINER KIT PC300-7 PC360-7 pc50mr-2 cylinder block 708-7R-13130

6742-01-5159 6742-01-1520 LINER KIT PC300-7 PC360-7 pc50mr-2 cylinder block 708-7R-13130 with easy-to-use Kate Komatsu part Machinery Co., Ltd parts graphics, giving you the ability to check parts availability, komatsu PC360-7 Parts pricing, Self Aligning Ball Bearings Category examine remanufactured options.

Category:Self Aligning Ball Bearings
Inventory:0.0
Minimum Buy Quantity:N/A
Weight:1.21
Product Group:B00152
Mounting Method:Tapered Adapter
Enclosure:Open
Rolling Element:Ball Bearing

Product Details

CategorySelf Aligning Ball Bearings
Inventory0.0
Minimum Buy QuantityN/A
Weight1.21
Product GroupB00152
Mounting MethodTapered Adapter
EnclosureOpen
Rolling ElementBall Bearing
Adapter SleeveH-2309
Cage MaterialPolyamide
Precision ClassABEC 1 | ISO P0
Internal ClearanceC0-Medium
Number of Rows of BallsDouble Row
Other FeaturesAllowable Misalignment 3 Deg | 1:12 Taper
Long Description45MM Bore; Tapered Adapter Mount; 100MM Outside Diameter; 36MM Inner Race Width; 36MM Outer Race Width; Open; Polyamide Cage; Double Row of Balls; ABEC 1 | ISO P0; C0-Medium
Inch - MetricMetric
UNSPSC31171532
Harmonized Tariff Code8482.10.50.68
NounBearing
Keyword StringSelf Aligning
Weight / LBS2.91
Outer Race Width1.417 Inch | 36 Millimeter
d1.772 Inch | 45 Millimeter
Inner Race Width1.417 Inch | 36 Millimeter
D3.937 Inch | 100 Millimeter
View more

Company Profile

View more

Related News

  • High temperature gear pump is an essential equipment for polyester melt conveying, pressurization and melt metering. High temperature gear pump than other types of melt pump compact structure, reliable operation, low energy consumption, high volume...
  • Fault 1: Mud pump Vibration Cause: Pump shaft and motor different heart, impeller imbalance, bearing damage. Solution: Adjust the concentric degree, leaf rotation balance test, replace the bearing. Fault 2: Pump water Slow Cause: The front...
  • First, preface My company a screw pump suddenly tripping. Maintenance personnel at the scene to the pump cause investigation and maintenance. After the demolition of the pump inspection, the reason for the trip is the copper bushing and shaft diameter...
  • Recommended Products

    All Products Contact Now